Dryer Tube Replacement

Recently IRH took on the challenge of replacing a 600,000 lb. Louisville dryer tube. This task was unique as it required operating in a confined space without disturbing building access or the process piping. Thanks to our team of expert engineers and experienced riggers, we were able to complete the job safely and with precision. In total 27 critical lifts were completed by the IRH heavy rigging team without a single incident.

 

[widgetkit id=789]

Leave a comment

graphic of an American flag
Salt Lake City Location
961 S Pioneer Rd
Salt Lake City, UT 84104
Phone: 800-334-2409